Fresno, Tulare, Kern, Stanislaus, San Joaquin, California
Solar installation in Central Valley.
A local crew with PG&E experience, and same-day support when you need it.
Local snapshot.
9 kW
typical system
PG&E
utility
Your utility under NEM 3.0.
Central Valley homes run AC harder than anywhere else in the state, which makes the high consumption side of a PG&E bill the dominant cost. NEM 3.0 hurts exports less here because more solar gets self-consumed during the day.
Solar-only payback
9–12 years
Solar + battery payback
5–7 years
Solar in Central Valley.
Best year-round irradiance in our service area, so the highest production per panel
Newer construction with simple roof geometries makes for fast installs
AC-load battery sizing critical for July–September peak rate avoidance
PSPS exposure in foothill ZIPs qualifies many homes for SGIP Equity Resiliency